Friends of Castle Park LogoCastle Park Logo

Castle Park Redevelopment

New Bridge

A 4m wide bridge with fully accessible ramps and connecting paths has been constructed to better connect the two sides of the park. This has been positioned so that it connects the splash pool with the children’s play area, and Sworders Field with the new events space in Castle Gardens.

A photo of the timber railing on the bridge matches the cladding of the refurbished buildings.
The timber railing on the bridge matches the cladding of the refurbished buildings.
A photo of the previous bridge showing its poor accessibility.
The previous bridge showing its poor accessibility.
A photo of the new bridge being lifted into position.
The new bridge being lifted into position.
A photo of workmen constructing the steps at the bridge.A photo of building new connecting paths to the bridge.
A photo of the construction of the new access ramp for the new bridge.
The construction of the new access ramp for the new bridge.